For decades, some in the U.S. government backed by a few in the nuclear industry and perhaps more in what I call the “nuclear priesthood”–those who have conducted their careers in the shadows of the nuclear industry and in academic settings where they can promote all things nuclear–have espoused the idea of reprocessing used fuel rods (also known as high-level radioactive waste) and creating MOX (plutonium-based) fuel for use in commercial nuclear reactors.
It’s always been a stupid idea environmentally–reprocessing is perhaps the dirtiest of all nuclear industry processes–and an even stupider idea economically. That’s because reprocessing is so expensive that mining and enriching uranium from scratch is still cheaper and always will be. Use of plutonium fuel would also exacerbate nuclear accidents, another trait that makes it undesirable, even for most of the nuclear industry.
For some years, NIRS ran a NIX MOX campaign, that was fairly successful at keeping the MOX concept in the dark corners of the priesthood. But the idea keeps coming out again and again for air, and thanks primarily to the determined efforts of some South Carolina Congressmembers–who can count only money and a few jobs and refuse to acknowledge both the short-term dangers to their state and the long-term environmental devastation a major MOX program inevitably would deliver–the government began construction of one of the pillars of a MOX facility at the Savannah River Site several years ago.
Almost since the first shovel of construction dirt was turned, the government–particularly the Obama administration–has tried to kill the project, knowing that it is both unnecessary and unaffordable. And yet, those South Carolina Congressmembers keep the money flowing in. Not enough to actually build the thing, but that’s not the point for them. The point for them is money, pure and simple. It’s the flaunting of pork barrel politics at its most basic level.
A new report, commissioned by the Department of Energy (where the MOX program still has some backers), was “released” Friday. You’ll see below why we put “released” in quotes. Savannah River Site Watch (SRS Watch) has reviewed the report–which finds that at current funding levels, the project can never be completed. Increasing the funding to meet the staggering costs to finish the job would be just about impossible.
Below is SRS Watch’s statement on the report.
Redacted DOE Plutonium Disposition Report Obtained, Gives Details of $47.5 Billion to $110.4 Billion Yet to be Spent on Plutonium Fuel (MOX) Boondoggle, Finished in 2059 to 2115
Aerospace Report Affirms that MOX Project at SRS Not Sustainable at Current Funding Level
Columbia, SC — A long-awaited report commissioned by the U.S. Department of Energy (DOE) on costs for two methods of plutonium disposition was released to some members of the public by Congress late on Friday afternoon, May 8. The redacted report provides details on the skyrocketing cost estimate for the problem-plagued plutonium fuel (MOX) project now under construction at DOE’s Savannah River Site (SRS) in South Carolina, one of the costliest U.S. Government construction projects ever undertaken.
The report confirms what Savannah River Watch has been saying – that the current funding level of $345 million per year has placed the project on a shut-down track. The report, using the term “real year” (RY) for equivalent cost in future years, states that the MOX plant “construction cannot be completed at current (FY14) funding level (350M RY$/year cost cap on construction/capital) and the assumed escalation rates (4% construction and capital, 2% labor).”
“The information in the report is another huge blow to the mismanaged MOX project, which was already suffering from a DOE decision made earlier on the same day to back away from its preference to dispose of surplus weapons plutonium as MOX fuel,” said Tom Clements of Savannah River Site Watch. “Congress must pay close attention to the conclusions in the report and realize that the last justifications to continue wasting money on the MOX boondoggle have ended. MOX is proving to be like an ever-weakening boxer losing round after round but still managing to stagger back onto its feet for yet more punishing blows that in the end will only lead to a loss. MOX is severely damaged and bleeding heavily and no amount of care by its political minders can patch together a way forward to survival.”
The redacted report states at the top that it has been “ APPROVED FOR PUBLIC RELEASE BY NNSA, MAY 8, 2015. PROPRIETARY/SENSITIVE INFORMATION HAS BEEN REDACTED” but it is unknown if the DOE’s National Nuclear Security Administration (NNSA) distributed the report in any public way. Key public interest groups did not receive the document directly from NNSA.
The report was released on the same day that a DOE environmental process on MOX formally concluded with MOX no longer being the “Preferred Alternative” for plutonium disposition. SRS Watch supports immobilization of plutonium in high level waste as the best option.
The report was prepared for NNSA by Aerospace Corporation, a Federally-Funded Research and Development Center (FFRDC) chosen by DOE to do the report after it was required to do so by Congress in the Omnibus spending bill passed in mid-December 2014. Congress required a review of costs of two plutonium disposition options: MOX fuel fabrication and irradiation and the “Downblend Option.” The National Defense Authorization Act of Fiscal Year 2015 also requires a second plutonium disposition report on more plutonium disposition options to be released in September of this year.
The report states (on page 24) that approximately $9.4 billion are required to complete the MOX plant (“at 85% confidence”). With $4 billion sunk, thus putting the cost of the mismanaged MOX plant near the $12.3 billion figure reported by NNSA in the DOE’s Fiscal Year 2016 budget request. The MOX plant is under construction by CBI AREVA MOX Services and the company faces construction problems, admitted by the NNSA on March 25, as well as fraud allegations for improper approval of construction work orders. Aerospace avoided discussing those serious and potentially costly matters.
There is no indication that Congress has interest in increasing the $345 million level or has money to do so and, according to SRS Watch, the MOX project has thus been debilitated and is not viable. On April 28, the Obama Administration objected to the $345 million funding level by the U.S. House and maintained its opposition “to language in the bill that requires the Secretary of Energy to continue construction of the Mixed Oxide Fuel Fabrication Facility. ”
The Aerospace report confirms figures included in a summary of the document obtained by the Union of Concerned Scientists on April 22 – that the “to go” cost of the MOX project looking forward, not including the prior year expenditure of about $4 billion on the MOX plant, is from $47.5 billion (at a $500 million/year funding level) to $110.4 billion (at a $500 million/year spending level).
At the $375 million per year funding level, the MOX plant would start operation in 2100 and the project would conclude in 2115, with a MOX plant operating cost of greater than $3 billion per year.
At the $500 million per year level the MOX project would start operation in 2044 and be finished with its mission in 2059, with an annual operating cost of between $1.1 billion and $1.3 billion.
The annual operating cost figures for both options are well beyond the figure of around $800 million per year that SRS Watch has been saying would be needed yearly for all phases or MOX plant operation and support activities. The Aerospace estimates do not include MOX plant decommissioning, demolition and return to green filed, costs that would be substantial. Likewise, the report only mentions problems posed by lack of reactors to use MOX. The report does not discuss potential design issues or technical problems with the MOX construction, start-up or operation.
Despite requests by SRS Watch, AREVA, CB&I AREVA MOX Services and political boosters of MOX (Senators Lindsey Graham and Tim Scott and Representative Joe Wilson) have refused to release their cost estimates for the MOX project, leaving them with little basis for complaining about the Aerospace cost estimates or its methodology.
Costs for blending down and disposing of plutonium in the now closed Waste Isolation Pilot (WIPP) in New Mexico is determined by Aerospace to be $17.2 billion and the project would end around 2049. The report goes on to recognize that WIPP poses challenges given that it is currently shut down, that it has capacity limits and that the law governing WIPP – the Land Withdrawal Act – would face opposition if it had to be changed. The report affirms that “In the absence of WIPP, another facility would need to be constructed and certified for use, which would add significant time and cost to the Downblend Option.” (p. 33)
In a nod to SRS Watch, the report acknowledges “that Nuclear activist groups are highly active in South Carolina” on the MOX issue and may have qualitative impacts on the project. (page 33)
Aerospace commented in the report about a meeting at SRS on January 27-29, 2015 in which they met with a host of SRS officials and contractors about plutonium disposition. (page 7)
###
Notes:
1, Aerospace Corporation redacted report entitled “Plutonium Disposition Study Options Independent Assessment,” April 13, 2105.
2. NNSA Final Supplemental Environmental Statement of plutonium disposition website, May 8, 2015 – NNSA reverses position in support of MOX option in reactors owned by the Tennessee Valley Authority
3. “TVA awaits decision on getting fuel made from surplus nuclear warheads,” Chattanooga (TN) Times Free Press article, May 6, 2015.
4. SRS Watch news release on plutonium disposition environmental process that ended with MOX as no longer being the “preferred alternative,” May 4, 2015 – with links to MOX plant photos that can be used with credit .
5. Union of Concerned Scientists news release with link to 1-page Aerospace cost summary.
6. Obama Administration position against House Energy & Water language to continue MOX plant construction, April 28, 2015.
April 28, 2015
STATEMENT OF ADMINISTRATION POLICY
H.R. 2028 — Energy and Water Development and Related Agencies Appropriations Act, 2016
Disposition of Weapons-Usable Plutonium. The Administration objects to language in the bill that requires the Secretary of Energy to continue construction of the Mixed Oxide Fuel Fabrication Facility. This language is unnecessarily restrictive and would preclude alternative, and potentially more cost-effective, approaches to implementing U.S. commitments in the 2000 Plutonium Management and Disposition Agreement and its 2010 annex to dispose of excess weapons plutonium. DOE contracted for an independent validation of costs for plutonium disposition alternatives in accordance with congressional mandates. The results of that analysis will inform the Administration’s approach to plutonium disposition. Information on the first phase of that analysis was provided to the Congress on April 21st.
Contact:
Tom Clements
Director, Savannah River Site Watch
www.srswatch.org
https://www.facebook.com/SavannahRiverSiteWatch
1112 Florence Street
Columbia, South Carolina 29201
Michael Mariotte
May 11, 2015
Permalink: https://www.nirs.org/2015/05/11/redacted-doe-report/
Your contributions make publication of GreenWorld possible. If you value GreenWorld, please make a tax-deductible donation here and ensure our continued publication. We gratefully appreciate every donation of any size.
Comments are welcome on all GreenWorld posts! Say your piece. Start a discussion. Don’t be shy; this blog is for you.
If you’d like to receive GreenWorld via e-mail, send your name and e-mail address to nirs@nirs.org and we’ll send you an invitation. Note that the invitation will come from a GreenWorld@wordpress.com address and not a nirs.org address, so watch for it. Or just put your e-mail address into the box in the right-hand column.
If you like GreenWorld, help us reach more people. Just use the icons below to “like” our posts and to share them on the various social networking sites you use. And if you don’t like GreenWorld, please let us know that too. Send an e-mail with your comments/complaints/compliments to nirs@nirs.org. Thank you!
GreenWorld is crossposted on tumblr at https://www.tumblr.com/blog/nirsnet
Thank you . This is very complicated for those that are not schooled in nukes . Bottom line ; waste money on a failed project is ok if you get campaign money for pushing it . The best government money can buy . The people need campaign finance reform now .
The other shoe is dropping big time on MOX. A licensing intervention by Nuclear Watch South, Blue Ridge Environmental Defense League and Nuclear Information and Resource Service raising issues about inadequate plutonium security plans at the beleaguered MOX factory received a decision from the U.S. Nuclear Regulatory Commission (NRC) which was made public last Friday. The NRC is the licensing authority for the MOX plutonium fuel factory and decided 2-1 to give a pass to a French MOX design which relies upon two computers for inventory control of 50 tons of plutonium (only 15 pounds, 420 grams, is required to fashion a nuclear weapon which can vaporize a city). U.S. regulations clearly call for physical, not virtual, inventory control. Commissioner Baran wrote a wonderful dissenting view (see the last three pages) in which he decries the NRC’s risky refusal to look at cybersecurity in the MOX case. Read the decision: http://www.nonukesyall.org/pdfs/CLI-15-09.pdf
Nuclear power/weapons is/are incompatible with a democratic society. Too much power is in the hands of self-serving psychopaths. Nukes are already dead of market forces but the desperate industry is frantically applying the paddles and mouth-to-mouth in hopes of eliciting a pulse.
You GO Don !!!
Reblogged this on nuclear-news.
Reblogged this on "OUR WORLD".